Custom Designed Shelf Data Rack
Client Project: Telstra Optical Network Terminator
Project Detail:
As part of decommissioning the South Brisbane Exchange, during 2012, Telstra began replacing the existing copper line network with optical fibre.
As part of the solution for the multi-line customers, Complete Wiring was commissioned to provide a unit to hold the Optical Network Terminator with backup battery supply units. Complete Wiring designed a solution which included a:
- Custom designed shelf data rack,
- Custom designed power distribution unit with single circuit switching and protection, and a
- Custom designed shelf that maximised air flow, eliminating the need for an additional cooling mechanism.